Yes this is by design in 5.1.
Not sure if there is a simple way to reset.
A work around is to copy the content to a new workflow, add the initial workflow in the copy and use the synchronize presentation.
Christophe.
Yes this is by design in 5.1.
Not sure if there is a simple way to reset.
A work around is to copy the content to a new workflow, add the initial workflow in the copy and use the synchronize presentation.
Christophe.